Home G1 G2 G3 G4 G5 G5b G5c G6 G7

MJC CLIP (double I-Joists)

Equally space MJC either side of incoming load at 400c/c.

Install Backer blocks only if required for joist hanger.

MJC positioned top and underside of joist.

Optional extra MJC if required.